CN

Home  /  News  /  Company News

How to arrange the pipes of the central feeding system?

Time:2020-12-23 10:43:31  Author:Tongyi Xiaobian   Hits:929

 

How to arrange the pipes of the central feeding system?

The central feeding system is composed of most central feeding system accessories, so the area occupied will be relatively large, and the entire workshop is often required. Then, there are high requirements for the pipeline layout of the central feeding system. The wrong pipeline layout will not only reduce the production efficiency, but may also damage the machine. If you want to change it after the layout is completed, it is very complicated. Therefore, the pipeline layout of the central feeding system in the early stage is very important. It is very important to gather the pipelines of the feeding and the central feeding system. A reasonable pipeline can improve the operation and processing speed of the feeding. Therefore, how to choose and arrange the pipelines is very important. Then the pipelines of the central feeding system How to arrange it? The following is an introduction by the technical staff of Dongguan Tongyi Plastic Machinery Manufacturing Co., Ltd.: the central feeding system

1. The pipeline should be planned according to the actual situation of the enterprise, and the space occupied by the entire feeding system and the traffic conditions should be considered. It is necessary to coordinate the overall resources to ensure the rationality of the pipeline.

2. The selection of the pipeline site should be convenient for pipeline installation, maintenance and material transportation.

3. The number of elbows should be reduced as much as possible. Once the number of elbows is too large, it will cause serious instability of the conveyed material and may cause blockage. Therefore, in the placement of pipelines, the number of elbows should be reduced. And it is forbidden to connect the two elbows or to be too close, so as to avoid the lack of speed when entering the second elbow after passing through the first elbow, resulting in blockage.

4. The length of the conveying pipeline should be reduced as much as possible under the condition of transportation. If it must be lengthened, the combined piping of the horizontal pipe and the vertical pipe can be used in appropriate sections. The material may appear too slow and accumulate in the long horizontal pipe transportation. Therefore, the length of the pipeline is not easy to be too long.

How to arrange the pipelines of the above central feeding system is introduced here. The central feeding system adopts the vacuum transmission method, and the plastic raw materials are transported from the storage tank to the central drying system through the centralized pipeline system.